<% session("URL")=request.servervariables("URL") session("string")=request.servervariables("query_string") %> China International Fair for Investment and Trade
 
 
¡¶International Investment Express¡·

2003
  2003-9-10
  2003-9-9
  2003-9-7
  2003-8-22
  2003-8-8
.......
 
2002
  2002-9-11
  2002-9-10
  2002-9-9
.......

 

 

 

Projects for overseas investment and co-operation


INDUSTRY
1. Transfer gearbox for cross-country vehicle
Name:First Automobile Group of China Harbin Transmission Factory
otal investment: US$10 million
Intended mode of investment: EJV, CJV
Summary of the proposed project: Production NP231 and NP 242 transfer gearbox 60,000 sets per year.
Person in charge of the project: Mr. Cui Chunlin
Tel: 86-451-4300051
2. Industrial pump
Name: Tianjin Electromechanically Industry Holding Company Group
Total investment: US$20 million
Intended mode of investment: EJV WOF MER.ACQUI.
Summary of the proposed project: The manufacture of single, double and triple screw pumps and the helical-lobe compressor and series products.
Person in charge of the project:
Tel: 86-22-27305844
3. Hard alloy micro drills and hard alloy extrusion molding line
Name: Nanchang Hard Alloy Factory
Total investment: US$12 million
Intended mode of investment: Joint Venture or Cooperation
Summary of the proposed project: To use WC powder, Co powder and a mix as raw materials to produce rods for micro drills in introduced process, then turn the rods into hard alloy micro drills. To add 58 sets of equipment and build 5,000 square metres of workshops to the extrusion line. To add 110 sets of equipment, build 4,000 square metres of workshops and supporting facilities for the micro dill production line.
Person in charge of the project: Hu Genren
Tel: 86-791-3817702
4. GMP innovation of the Chinese patent medicine production line
Name: Jiangxi Guangfeng Pharmaceutical Factory
Total investment: US$1.8 million
Intended mode of investment: Joint venture. The investor should have advantage of funds and marketing network.
Summary of the proposed project: To build 6,000 square metres of workshops based on the GMP requirements so as to reach the annual capacity of 200 million capsules and 300 million tablets.
Person in charge of the project: Zheng Tanghua
Tel: 86-793-2652695
5. Traditional Chinese prepared herbal medicine slices
Name: Jiangxi Zhangshu Pharmaceutical Group, Zhangbang Pharmaceutical Company, Ltd.
Total investment: US$12 million
Intended mode of investment: Joint venture, cooperation or purchase (the Chinese partner has some shares with the workshops, equipment and intangible Assets).
Summary of the proposed project: 1. To use computer controlled technology to process the slices. 2. To use modern technology to process, dry, pack and store the slices. 3. To adopt advanced extracting technology to develop small dose, boiling-free herb slices. 4. To adopt modern technology to control the quality of the herbs and improve the processing technique. Based on the sales in recent years, it is estimated that the demand can reach 50,000 tons.
Person in charge of the project: Huang Huiguang
Tel: 86-795-7333733 7332665
6. Rutile titanium white
Name: Jiangxi Gandong Chemical Company, Ltd.
Total investment: US$33.7 million
Intended mode of investment: Joint Venture.
Summary of the proposed project: To adopt advanced sulphuric process to produce titanium white. To build another titanium white production line beside the existing one to produce annually 20,000 tons of rutile titanium white.
Person in charge of the project: Liu Shuanglong Chen Yue
Tel: 86-794-8351310
7. Double screw freon-free compressor for central air conditioner
Name: Huayi Compressor Joint Stock Limited Company
Total investment: US$60.2 million
Intended mode of investment: Joint Venture or Cooperation
Summary of the proposed project: To introduce the advanced design and production technology and key equipment to produce annually 50,000 sets of double screw freon-free compressor for air-conditioners.
Person in charge of the project: Jiang Tianran
Tel: 0798-8470166
8. Automobile absorber system, oil pump, flow nipple, lamp, shock absorber
Name: The Automobile Industry Management Office of Jiangxi Province
Total investment: To Be Negotiated
Intended mode of investment: Joint Venture, Cooperation or Sole Investment
Summary of the proposed project: To produce automobile instrument assembly, anti-lock braking system, air bag, lamp assembly, shock absorber, air-conditioner, high-pressure oil tube assembly and other automobile parts. 1. To introduce technology and products. 2. To innovate the production lines and purchase new equipment.
Person in charge of the project: Wang Donglin
Tel: 86-791-6350294
9. 120 H.P. petrol engine
Name: Jiangxi Pingxiang City Ke 'er Engine Company, Ltd.
Total investment: US$10 million
Intended mode of investment: Joint Venture
Summary of the proposed project: To build a new assembly workshop, an engine test workshop, warehouses and public facilities, and purchase some key equipment so as to produce 30,000 petrol engines annually
Person in charge of the project: Wang Chengyi
Tel: 86-799-6793370
10. Innovation of large-sized deluxe coach production line
Name: Anyuan Industrial Stock Ltd Company, Pingxiang Coach Factory
Total investment:US$23.9 million
Intended mode of investment: Joint Venture or Cooperation
Summary of the proposed project: To innovate the punching, machining, die making, welding, coating and assembly lines, add 221 sets of equipment, and build workshops of 13,956 square metres so as to reach an annual production capacity of 1,000 deluxe coaches.
Person in charge of the project: Ding Jianping Peng Mei
Tel: 86-799-6581172
11. Automobile spring, torsion bar and stabling bar
Name: Jiangxi Changli Automobile Spring Company, Ltd.
Total investment: US$25 million
Intended mode of investment: Joint Venture
Summary of the proposed project: To set up an automobile plate spring production line to produce another 20,000 tons of automobile plate spring and a line to produce 800,000 automobile torsion bars ad stabilizing bars.
Person in charge of the project: Tang Jianheng
Tel: 86-791-8394097
12. Deluxe coach
Name: Shangrao Jinxin Industrial Stock Company, Shangrao Coach Factory
Total investment: US$15.7 million
Intended mode of investment: Joint Venture or Cooperation.
Summary of the proposed project: To introduce advanced foreign high-grade coach design and production technology and key equipment to reach an annual production capacity of 500 deluxe coaches, of which the new capacity should be of 320 coaches.
Person in charge of the project: Chen Rui
Tel: 86-793-8222468
AGRICULTRUE
1. Modern agriculture technological demonstration park
Name: Agriculture Industrial Development Corporation of Hefei Economic-Tech Development Zone
Total investment: US$10 million
Intended mode of investment: C.J.V.
Summary of the proposed project: There are 500mu residential quarters1500mu gardening quarters 1000mu animal farm zones of high quality and efficiency, 1500mu agriculture quarters, etc.
Person in charge of the project: Lu Ge
Tel: 86-551-3811070
2. Protein-separated technical transformation
Name: AnHui ShouXian
Total investment: US$10 million
Intended mode of investment: E.J.V.,
Summary of the proposed project: To import soybean-protein-separating equipment
Person in charge of the project: Wang Wenhu
Tel: 86-564-4660088
3. Producing edible fungus
Name: Huangshan Shanhua Group Co.
Total investment: US$12.1 million
Intended mode of investment: E.J.V.,
Summary of the proposed project: Setting up 1650mu mushroom base, 2.475 million wooden mushroom trees.
Person in charge of the project: Mrs. Ouyang Xin
Tel: 86-559-2512193
4. Xiamen Brand-Name Flowers & Plants Growing Base
Name: Xiamen Fine-Strained Trees Cultivating Base
Total investment: US$1.2 million
Intended mode of investment: JV, Coop, or Share Holding
Summary of the proposed project: Xiamen is under the influence of subtropical oceanic monsoon climate. Xiamen fine-strained trees cultivating base is one of the national hi-tech biology grounds, importing dozens of patented technology from the Chinese Academy of Forestry. The project is to build a one-hectare glasshouse, two-hectare green house, a biotech research centre, and an exhibit area. After completion it can produce 2.5 million sprouts, 1 million seed balls, and 2 million freshly cut flowers per year. The yearly sales income is 8 million RMB. It will take 3.5 years to recover the investment. The profit and tax rate is 40%.
Person in charge of the project: Huang Xin
Tel: 86-592-6316120
5. Good-breed stud pigs base
Name: Animal Nutrition Research Centre, Fujian Provincial Academy of Agriculture
Total investment: US$1 million
Intended mode of investment: Share System
Summary of the proposed project: The project is to cover 35mu, and import 600 good breeds of sows and 50 boars. After establishment it will provide 3,500 stud pigs and 6,500 commercial meaty pigs a year. It will build 10 workshops to raise pigs equipped with modern facilities, covering 3,959 square meters, and 400-square-meter feeds processing workshops. It will also build discharge treatment facilities covering 1,000 square meters, one stud pigs assessing stop, one quarantine and insemination room of 100 square meters, and one office complex of 600 square meters.
Person in charge of the project: Feng Yulan
Tel: 86-591-7884477
6. Fujian ocean-going fishery
Name: Fujian Ocean-Going Fishing (Group) Co.
Total investment: US$30.1 million
Intended mode of investment: Coop or JV
Summary of the proposed project: Fujian is calling for speedy development of ocean-going fishery. At present there are relatively stable resources of ocean abalone and tuna. The project is to build six super low temperature tuna longline clipper, and four ocean squid angling ships. The profit rate is 13%. It takes six years to recover the investment.
Person in charge of the project: Su Long Yu Zhaoluan
Tel: 86-591-3330328
7. Fast-growing & high-yield trees
Name: Fujian-Yongan Forestry (Group) Co., Ltd
Total investment: US$5.5 million
Intended mode of investment: JV
Summary of the proposed project: Yongan Forestry (Group) Co., Ltd is a conglomerate engaging in timber-related businesses with total assets exceeding 900 million RMB. The forestry area under its management is over 90,000 hectares. The project is to build a 1 million-mu base of fast growing and high-yield trees like mason pine, eucalyptus and paulownia. Among them 475,000mu are for tree strains available now, and 525,000mu for new trees.
Person in charge of the project: Xie Yilin
Tel: 86-598-3633405-8009
8. Pigs raising
Name: Longyan Industry-Based Meaty Pigs Raising Co., Ltd
Total investment: US$93.1 million
Intended mode of investment: Joint Man- agement Or Sole Investment
Summary of the proposed project: The project includes the following items: 1 To build a vet clinic and a laboratory and examination centre for vet medicine, feeds, and meat; 2 To build a stud farm with 600 pigs, and nine breeding farms each with 350 pigs on hand; 3 To build two meat products processing factories to process 800,000 pigs a year, and a pig trading centre with an annual transaction of 1 million pigs; 4 To build 10 large farms with annual output of 10,000 pigs upwards, 300 medium-sized farms with annual output of 1,000 pigs and more, and 7,000 farms with yearly output of more than 100 pigs; and 5 Feeds production facilities.
Person in charge of the project: Wei Jimin
Tel: 86-597-2320919
9. Processing of agricultural by-products
Name: Fujian Minzhong Vegetables& Foodstuffs Industry Co.
Total investment: US$16.8 million
Intended mode of investment: JV or Coop
Summary of the proposed project: To build a 3,200-square-metre workshop to freeze dehydrated vegetables, and set up six 110- m2 vacuum drying installations. And to put in place a 6, 400 m2 vegetables processing factory with respective production line for 45 tons of packet juice a day and 36 tons of canned juice a day. Cleaning workshops, warehouses and living facilities will also be built, covering 10,560 square meters. At the same time, 20,000-mu field will be cultivated for vegetables growing.
Person in charge of the project: Lin Guorong
Tel: 86-594-2795888
10. Dairy farm and dairy products
Name: Fujian Changfu Group Co., Ltd
Total investment: US$13.9 million
Intended mode of investment: JV
Summary of the proposed project: It is to introduce fine breed milk cows and advanced skills to raise them. Domestic or international advanced milking equipment and dairy goods processors will be used to raise 8,000 cows and to produce 30,000 tons of dairy products per year.
Person in charge of the project: Chen Xuekun
Tel: 86-599-8635188
11. Vegetable production base
Name: Shenzhen Lupeng Agricultural HI-tech Enterprise Co., Ltd.
Total investment: US$3.5 million
Intended mode of investment: Joint Venture,
Summary of the proposed project: According to agricultural product market condition in Hongkong, it is very feasible to produce high quality vegetable in a factory-style production base for Shenzhen-Hongkong agricultural product market by using the soilless cultivation technology developed by Lupeng company. Person in charge of the project: Tian Lizhong
Tel: 86-755-5879188
12. Biological Marine Medicine Industrial Park
Name: Indio Growful Pharmaceutical Group Co.
Total investment: US$84 million
Intended mode of investment: Joint Venture, Cooperation
Summary of the proposed project: The biological marine medicine industrial park includes development and production of marine medicine, biology engineering industry and Chinese traditional medicine. Product of the first stage consists of: 2nd type new medicine of 3, 3rd type new product of 3, marine health care product of 3, 5th type new product of 1.
Person in charge of the project: Chen Minfang, Sun Hongyan
Tel: 86-532-2731148
TERTIARY INDUSTRY
1. A scenic spot
Name: Senic Spot Management Committee of Jiuhua Mountain
Total investment: US$72.8 million
Intended mode of investment: Equity Joint Venture, Contractual Joint Venture
Summary of the proposed project: Move the administration department to the foot of Jiuhua Mountain, and build the new scenic spot of Ke Village, in which these project needed: way, communications, dustbin processing, water supplying, dirty water processing, flood-proof facilities etc.
Person in charge of the project: Gui Ling
Tel: 86-566-5011698
2. Supporting projects for the Zhangzhou Campus of Xiamen University
Name: The Preparation Office for Zhangzhou Campus of Xiamen University
Total investment: US$36 million
Intended mode of investment: JV or Coop
Summary of the proposed project: Xiamen University is the only national key university in Fujian. It's listed on the national 211 Project for further development. It's under planning to recruit 30,000 more resident students. The new campus is under construction in Zhangzhou.
Person in charge of the project: Fu Wenyi
Tel: 86-596-6852902
3. Students' dormitories & academic exchanges center
Name: Longyan College (Under Planning)
Total investment: US$3.6 million
Intended mode of investment: JV
Summary of the proposed project: Longyan College has an enrollment of 5,000 students with 600 teaching staff. There will be two ways to build the dormitories: One is to build them in the surrounding areas. The investor will be responsible for everything and own the property rights. He/she is to rent out to the college; The other one is to locate them in the campus.
Person in charge of the project: Li Yuanjiang
Tel: 86-597-2207727
4. Fuzhou Finance & Economic Certified Accountants Office
Name: Fuzhou Municipal Finance Bureau
Intended mode of investment: JV or Coop.
Summary of the proposed project: The both sides will have discussion.
Person in charge of the project: Hu Yongjun
Tel: 86-591-3265973
5. Fuzhou International Logistical Service Center
Name: Fuzhou Bonded Area Economic Development Bureau
Total investment: US$30 million
Intended mode of investment: JV
Summary of the proposed project: To build warehouses on the available space within the Bonded Area, covering an area of 30,000 square meters. The Bonded Area provides sufficient power and water supply, efficient telecommunication, complete service facilities, and favourable treatments.
Person in charge of the project: Chen Jin
Tel: 0591-3983940
6. Ningde Sewage Treatment Plant
Name: Ningde Municipal Construction Committee
Total investment: US$17.8 million
Intended mode of investment: BOT
Summary of the proposed project: Currently there's no such facility in Ningde Municipality. The project's daily treatment is aimed at 40,000 tons, which will be expanded to 80,000 tons in the future. SBR is to be employed to reach the national Grade II level. The project include building the processing facilities, the pipe network, the pumping station, etc.
Person in charge of the project: Chen Kaibin
Tel: 86-593-2382409
7. Shenzhen Dapeng Longqi Bay Ecological Park
Name: Management Office of Shenzhen Dapeng Longqi Bay Ecological Park
Intended mode of investment: Joint Venture, Cooperation or Others
Summary of the proposed project: Shenzhen Dapeng Longqi Bay Ecological Park is located at the bank of Longqi Bay, covering a land area of 9.04 square kilometers, being one of the hi-tech industry zones in Shenzhen city.
Person in charge of the project: Li Wenchao, Director of Management Office of
Tel: 86-755-4314363 13902981009
9. Shengzhen Shenhua International Agency Cooperation Project
Total investment: US$5 million
Intended mode of investment: Joint Venture, Cooperation
Summary of the proposed project: Shenghua International Travel Agency is a class one travel agency approved by State Travel Bureau, which has registered capital of RMB18, 360,000 yuan. Shenhua International Travel Agency's businesses include international travel and domestic reception. We have an experienced, well-trained administration group and a multilingual cicerone and interpreter group. Over the past several years we have created our brand and won great fame.
Person in charge of the project: Li Qiangqiang, Project Manager
Tel: 86-755-2306697
10. Tertiary Industrial Project
Name: Shenzhen Airport Group Co., Ltd.
Total investment: US$182 million (RMB 1.5 billion Yuan)
Intended mode of investment: Joint Venture
Summary of the proposed project: This project is a key project for constructing Shenzhen into a regional logistic center, and also an important measure to improve logistics service environment in the Pearl River Delta Area. It will occupy an area of 116 hectares, which will be divided, into four parts: air cargo center, free trade zone, and airport industry & trade park, shipping center.
Person in charge of the project: Mr. Fan Guangmin, Mr. Xie Bing
Tel: 86-755-7776383 7776353
11. Taiping Lake Emerald Holiday Village
Name: Taiping-lake Development Co., Ltd.
Total investment: US$60 million
Intended mode of investment: Equity Joint Venture
Summary of the proposed project: It is planned to build a four-star hotel, villa delux, camping club, golf-ground grass court, sandy beach bathing-place. It will offer more recreation service than sightseeing, nice dishes and so on.
Person in charge of the project: Ouyang Xin
Tel: 86-559-2512193
12. Nan-an Garbage & Sewage Treatment Plant
Name: Nan-an Construction Committee
Total investment: US$22.3 million
Intended mode of investment: JV
Summary of the proposed project: To meet the economic development the short-term aim of the sewage treatment plant is to treat 50,000 tons of sewage a day. It is to build the processing factory and the related facilities. The near-term target for the garbage treatment plant is 180 tons per day. It is to build the processing facilities, the enclosure, the drainage system, the processing tanks, and the like.
Person in charge of the project: Zhang Jianhong
Tel: 86-595-6382452
13. Shenzhen West Automobile Trade Market
Name: Shenzhen Nanyou (Holdings) Ltd.
Total investment: US$14 million
Intended mode of investment: Cooperation
Summary of the proposed project: To build a "One-Stop Service" Automobile-Trading Market which will include automobile sales, exhibition, maintenance, components supply, storage, insurance, financial service, automobile leasing, second-hand vehicle trading, license and other cultural and entertainment activities relating to automobile business.
Person in charge of the project: Shi Yungang
Tel: 86-755-6648702
INFRASTRUCTURE
1. Xiamen-Xiangyu Bonded Harbour Area
Name: Xiamen-Xiangyu Group Co., Ltd
Total investment: US$45.7 million
Intended mode of investment: Coop
Summary of the proposed project: Xiamen Port is a national Grade I port. Xiangyu Bonded Area is under the special supervision and management of the customs, approved by the State authority. The project is to develop the 15th and 16th wharves and a comprehensive service like warehouse and delivery.
Person in charge of the project: Luo Liangchun Xiao Zhicong
Tel: 86-592-6035811
2. Xiamen Eastbound Highway
Name: Xiamen Investment Corporation for Highways & Bridges Building
Total investment: US$397.6 million
Intended mode of investment: JV or Coop
Summary of the proposed project: Xiamen island with the mainland. Together with Xiamen Bridge and Haicang Bridge, they are to bring into being a radiating highway system. It is to cover Liuwudian and the planned harbor areas (50,000-tonnage or more berth), totalling about 5 km.
Person in charge of the project: Zeng ChaoZhou Yu
Tel: 86-592-5077741 5150279
3. Sea-Spanning Bridge connecting Xiamen with Zhangzhou
Name: Xiamen Highways Administration
Total investment: US$365.3 million
Intended mode of investment: JV orCoop
Summary of the proposed project: Scenario A: The full length is 9.4 kilometres, 6,017 metre for the bridge body and 3,383 metre the approach. Its four-lane and two-way driving. The bridge is 30 metres in width, the driveway 26 metres, and the sidewalk 2 metres at each flank; speed limit 100 km/hour.
Person in charge of the project: Zhu Wenbin
Tel: 86-592-5193513
4. Haowu Sewage Treatment Plant
Name: Shaowu Construction Committee
Total investment: US$10.2 million
Intended mode of investment: JV, Sole Investment, or Coop
Summary of the proposed project: It will cover 68.5 mu with daily processing capacity of 50,000 tons. It is planned to build one processing facility, one pumping station, and the filter pipes. The main technique is oxidation ditch.
Person in charge of the project: Wu Hao
Tel: 86-599-6328036
5. Nanping Urban House Refuse Treatment Plant
Name: Nanping-Yanxia House Refuse Treatment Co., Ltd.
Total investment: US$7.9 million
Intended mode of investment: Sole Investment or Coop
Summary of the proposed project: Hazard-free methods will be adopted such as recycling, burning, compost, and burying. It is to process 300 tons of refuse a day.
Person in charge of the project: Xie Jianchang
Tel: 86-599-8622989
6. Quanzhou-Xiaocuo Sewage Treatment System
Name: Quanzhou-Quangang District People's Government
Total investment: US$25.6 milllion
Intended mode of investment: JV orSole Investment
Summary of the proposed project: Quangang District is one of the six major national petrochemical bases under the state plan. There has been an array of enterprises of various sizes in operation, which calls for a sewage treatment network with daily capacity of 50,000 tons in the short term and 150,000 tons in the long term.
Person in charge of the project: Zhu Yunpeng
Tel: 86-595-7987800
7. Fuding Sewage Treatment Plant
Name: Fuding Construction Committee
Total investment: US$9.7 million
Intended mode of investment: BOT
Summary of the proposed project: The project will enable the discharges from urban households and industrial sectors to meet the national standard.
Person in charge of the project: Liu Zupin
Tel: 86-593-7812566
8. Zhangzhou-Dongshan Wujiao Bay Windmill Project (Phase II)
Name: Dongshan Wind Power Co.
Total investment:111.2 million
Intended mode of investment: Share-holding
Summary of the proposed project: In Wujiao Bay the wind power can reach 279 w/O with an effective period of 5,767 hours every year. It's suitable to install 100 generating units of 1,000 kw each according to the survey, and is estimated to generate 261.66 kw/h every year.
Person in charge of the project: Wang Meitao
Tel: 86-596-5887378
9. Quanzhou Water Coal Factory
Name: Jinjiang Fuel Co.
Total investment: US$54.2 million
Intended mode of investment: JV
Summary of the proposed project: Water coal is fluid fuel transformed from coal with high efficiency, low pollution, easy transport, and low cost. Therefore, it's widely in use. The project is in line with the national energy policy of replacing oil with coal.
Person in charge of the project: Shi Weixiong
Tel: 86-595-5682650
10. Equity transfer of the Cargo (Sand) Wharf in Fuzhou Port
Name: Fuzhou Harbor Businesses Group
Total investment: US$15 million
Intended mode of investment: Partial Equity Transfer
Summary of the proposed project: There's one 20,000-tonnage berth, 120 metres long, long piled, pier typed, and the related living facilities.
Person in charge of the project: Chen Kexiang
Tel: 86-591-3680058
11. 30,000-tonnage Multi-Purposed Wharf in Xiuyu, Meizhou Bay
Name: Putian-Meizhou Bay Harbor Administration
Total investment: US$23.6 million
Intended mode of investment: JV or Coop
Summary of the proposed project: Meizhou Bay is a key area for industrial development in Fujian. It's estimated that its throughput will reach 12.7 million tons by 2010.
Person in charge of the project: Pan Tianlin Wu Guozheng
Tel: 86-594-5697652, 5697643
12. Multi-purposed Wharf in Songxia Harbor, Fuqing Bay
Name: Fuzhou-Haiyi Harbor Developing Co., Ltd.
Total investment: US$36.1 million
Intended mode of investment: JV
Summary of the proposed project: It is to build a 30,000-tonnage multi-purposed wharf with annual handling capacity of 750,000 tons (80,000 TEU containers; 150,000 tons of sundry goods).
Person in charge of the project: Lin TuanXu Chuanxin
Tel: 86-591-3425203 3685064
OTHERS
1. Garbage Treatment Plant
Name: Huanggang City General Sanitation Administration
Total investment: US$8.3 million
Intended mode of investment: Joint Venture, Cooperation
Summary of the proposed project: Dispose garbage 400T/day mainly compost, supplementary fill and bury. Sales income 0.4 million per year, net profits: 0.12 million per year. Has ratified the proposal, feasibility study report and the design.
Person in charge of the project: Xu Jianxin
Tel: 86-713-8353513
2. Export-processing Area of Beihai
Name: Foreign Investment Promotion Division of Guangxi Foreign Investment Administration Office
Total investment: US$137.9 million
Intended mode of investment: Solely Foreign-funded
Summary of the proposed project: Construction Content: 1).Staring-up area: 1.23 km2, 40 million dollars. 2) District II: 1.63 km2, 53 million dollars. 3) Material warehouse area: 120,000 m2, 4.82 million dollars. 4) Standard warehouses: To build up 5 standard warehouses in the Material Warehouse Area, 0.78 million dollars.
Person in charge of the project:
Tel: 86-771-5331249, 2109158 2109005
3. Infrastructure of Jigong Mountain Scenic Spot
Name: Jigong Mountain Scenic Spot Management Bureau
Total investment: US$25.3 million
Intended mode of investment: Joint Venture, Cooperation
Summary of the proposed project: Construction of infrastructure facilities including water supply and drainage, power supply line, communication facilities and roads, etc.
Person in charge of the project: Liao Xianghong
Tel: 86-376-6912044
4. Xiaolangdi Scenic Spot
Name: The Yellow River Xiaolangdi Scenic Spot Development and Construction Corporation
Total investment: US$18.1 million
Intended mode of investment: Joint Venture, Cooperation and Others
Summary of the proposed project: Construction of infrastructure facilities and land development and use.
Person in charge of the project: Yu Yongtong
Tel: 86-379-7912794
5. Auxiliary business facilities for Olympic Park
Name: Beijing Municipality
Total investment: US$960 million
Intended mode of investment: Project Entity Shall be Selected on Bidding Basis
Summary of the proposed project: Guest rooms, office buildings, business, restaurants and parking area, with a building area of 800,000 square meters
Person in charge of the project: Liu Jingsheng
Tel: 86-10-66410894
6. National Swimming Center
Name: Beijing Municipality
Total investment: US$87 million
Intended mode of investment: Project Entity Shall be Selected on Bidding Basis
Summary of the proposed project: To build swimming gymnasium in the Olympic Park, with a building area of 71700 square meters
Person in charge of the project: Liu Jingsheng
Tel: 86-10-66410894
7. National Gymnasium
Name: Beijing Municipality
Total investment: US$31 million
Intended mode of investment: Project Entity Shall be Selected on Bidding Basis
Summary of the proposed project: To build gymnasiums for gymnastics and handball in the Olympic Park, with a building area of 256000 square meters
Person in charge of the project: Liu Jingsheng
Tel: 86-10-66410894
8. Tianjin TianBao International Hotel
Name: Tianjin Tianbao Holding Co.,
Total investment: US$11.8 million
Intended mode of investment: CJV,EJV
Summary of the proposed project: Tianjin TianBao International Hotel located at No. 389 Jingmen Road Tianjin Port Free Trade Zone. The total building area is 15.723 thousands square meter, and up to Four-Star Standard. The Hotel includes guestroom, meeting and other entertainment. The Hotel is under constructing.
Person in charge of the project:
Tel: 86-22-65750164
9. Hi-tech Industry, Mechanical Industry Chemical Industry, Medicine Industry And Other Processing Industries
Name: The Management Committee of Nanchang Economy and Technology Development Zone
Total investment: To be Negotiated
Intended mode of investment: Joint Venture or Sole Investment
Summary of the proposed project: To introduce hi-tech machinery, chemical industry, medicine industry, biology industry, garment, information industry and modern food processing industry enterprises and research institutes.
Person in charge of the project: Xu Jiangrong
Tel: 86-791-3805606 3805604
10. Information Industry, Photoeletric Device, New Materials, Biological Medicine And Modern Food Industry
Name: The Management Committee of Nanchang Hi-Tech Zone
Total investment: To be Negotiated
Intended mode of investment: Joint Venture, Cooperation or Sole Investment
Summary of the proposed project: 1. Dinging Biological Science and Technology Company biological reagent. 2. Nanchang Manometer Technology Company commercial scale production of manometer car- bon pipe. 3. Jiangxi Tekang Science and Technology Company, Ltd.
Person in charge of the project: Chen Zhenping
Tel: 86-791-8104941
11. New production line of 3,000 tons of electrolytic copper foil
Name: Jiujiang Electronic Materials Factory
Total investment: US$15.7
Intended mode of investment: Joint Venture or Cooperation
Summary of the proposed project: To extend the 18 rolled electrolytic copper foil production line to reach the annual capacity of 5,000 tons, of which the capacity of 3,000 tons of rolled foil should be added.
Person in charge of the project: Ma Defu
Tel: 86-792-8252044
12. Large power transmitting tube electronic elements
Name: The Electronics Group Company of Jiangxi Province
Total investment: To be Negotiated
Intended mode of investment: Joint Venture or Cooperation
Summary of the proposed project: To innovate the existing production lines, and introduce advanced foreign production line and CAD system so as to reach a scale production.
Person in charge of the project: Luo Wenyang
Tel: 86-791-6215446

 

 
Welcome Homepage | Share with my friends | Comments | Contact us
 
China International Fair for Investment & Trade ©
China(Xiamen) International Investment Promotion Center
<%Refer=Request.ServerVariables("HTTP_REFERER")%>